Musket Stormwater Basin - minor repairs

What

Minor repairs to the stormwater basin where topsoil has slumped or ground cracking have occurred.

Why

Occurring over time, several areas have had topsoil wash through the open draining gravel subsoil.

Where

39 Miromiro Street, Broomfield.

When

20 April 2026 to 24 April 2026. Monday to Thursday, 8am to 6pm (weather/site condition dependent).

Contact

The contractor is CORDE Limited. Phone Nina Shakhnovich on 027 204 2528, Monday to Wednesday, 8am to 5pm.

Details

  • All the works are to be undertaken off street excepting entry/exit of the basin.
  • Traffic and pedestrian management will be in place for vehicle and plant entry and exit. The footpath may be closed for short intervals when trafficking is to occur. The basin works will be clearly coned and signed to identify the works areas.
  • Localised noise will increase at times but will be minimised where possible and undertaken at considerate times of the day.

Takiuru ki ā mātou ratonga
Log in to our services