Hawkins Road and Hills Road - water and wastewater infrastructure upgrades

What

We are installing new potable water and wastewater reticulation. This includes trenching, pipe laying, testing (pressure and chlorination), connections, and surface reinstatement.

Why

This work is required to upgrade and replace aging water and wastewater infrastructure, improving network resilience and capacity to accommodate future growth.

Where

Hawkins Road, between 700 Hawkins Road and Prestons Road.
Hills Road, between Prestons Road and Langes Road.

When

20 October 2025 to mid March 2026. Monday to Friday, 7am to 6pm and Saturday, 8am to 12pm (weather/site condition dependent).

Contact

The contractor is Isaac Construction. Phone Hayley Ching on 027 323 0056, Monday to Friday, 9am to 5pm.
Please advise us if you have specific property access requirements e.g., medical visits, home help, large vehicle deliveries or any planned works.

Details

We will be installing new water and wastewater services within the Highfield Development area and along Hills Road. The new mains will improve reliability and allow for future growth in the network.

Hours of work will typically be, Monday to Friday, 7am to 6pm, and Saturday 8am to 12pm (weather/site conditions dependent).

Water supply will be maintained throughout the project. A separate notice will be provided prior to any temporary shut-off required to connect new pipelines.

Temporary traffic management measures will be in place. These may include road closures, detour routes, speed restrictions, and pedestrian/cycle management. Please follow all posted signage and directions from onsite traffic controllers.

We are committed to minimising disruption and will remove traffic management as soon as it is safe to do so.

There may be times when on-street parking and property access are temporarily restricted. Where required, the contractor will door-knock to allow residents to move vehicles.

Construction activities may result in temporary increases in dust, noise, and vibration.

We apologise for any inconvenience and thank you for your patience while we complete these important works.

If you wish to apply to have a water main connection supplied to your property, a separate letter will be delivered shortly detailing the application process.