Slater Street - road and footpath renewal

What

We’re renewing the road and footpath on Slater Street between Shirley Road and Warden Street. This full reconstruction will include the removal of the existing kerb and dish channel, the installation of two speed humps, the narrowing of the road in two locations, the replacement of existing trees and upgrades to the streetlighting.

Why

We’ve received funding to renew Slater Street between Shirley Road and Warden Street. At the same time, we’re planning some upgrades that will encourage motorists to travel at a safer speed and improve access for all road users.

Where

Slater Street, between Shirley Road and Warden Street, Richmond.

When

1 September 2025 to 5 December 2025. Monday to Friday, 7am to 6pm (weather/site condition dependent).

Contact

The contractor is Isaac Construction Ltd. Phone Jamie Te Whata 0273145534, Monday to Friday, 7am to 6pm.

Details

We’re fully reconstructing the road and footpath on Slater Street between Shirley Road and Warden Street.

To undertake this work safely, we will install a temporary southbound one-way system on Slater Street from Shirley Road to Warden Street.

Impacts on traffic

  • There will be no-entry to the northernmost block of Slater Street from Warden Street. Signposted detours, east and west, will be in place for northbound traffic.
  • Residents in this block of Slater Street will need to approach from Shirley Road and use the southbound one-way system to access their properties. Street exiting will be via Warden Street. See the section below for more information about impacts to property access.
  • The speed limit will be reduced to 30km/h through our work site.
  • Please follow all signage and the instructions of staff on site.
  • At times, we may need to close one end of Slater Street. If required, we will advise you closer to the time. 

Property access and other impacts of work

  • At times, access to private property will be restricted. Please advise our team if you have specific requirements e.g. medical visits, large deliveries, home help or any planned work.
  • At times, on-street parking will be temporarily removed while we work in the area. 
  • The contractors site office will be based in the carpark of the Shirley Community Reserve. Please be aware of trucks crossing.  Public parking will be unavailable here during the construction period.
  • There will be increased construction noise and vibrations at times, and we’ll do our best to keep this to a minimum.
  • The work will have no impact on any services such as electricity, telecommunications.
  • The timing of the work and certain activities will depend on the weather and the roads. We’ll provide updates if there are changes to the planned works.
  • Please put your bins out as usual by 6am on your collection day. Our team will move them and return them if needed.

See below a map of the area that we will be working in and the detour routes that will be in place.

  • Blue arrow: Vehicles travelling east will be detoured via Warden Street, Stapletons Road, and Shirley Road respectively.
  • Pink arrow: Vehicles travelling west will be detoured via Warden Street, Hills Road, and Shirley Road.

Takiuru ki ā mātou ratonga