Diamond Harbour - watermain renewal

What

We are replacing watermain and sub-main pipes, which are part of the annual renewals project.

Why

Existing watermain and sub-main pipes are reaching the end of their service life and require replacing.

Where

Marine Drive, Koromiko Cresent, Ranui Cresent, Ngatea Road, Te Ara Cresent, Marama Terrace and James Drive, Diamond Harbour.

When

21 July 2024 to mid December 2025. Monday to Friday, 7am to 6pm (weather/site condition dependent).

Contact

The contractor is Trenching Dynamix. Phone Gearóid Coholan on 027 342 3488, Monday to Friday, 7am to 6pm.
Please advise us if you have any specific property access requirements e.g. medical visits, home help, large vehicle delivers or planned works.

Details

  • There may be times when vehicle access to properties is temporarily restricted. The contractor will door knock beforehand to allow residents to move vehicles if necessary.
  • On-street parking during the works will be restricted, however full pedestrian access will be maintained.
  • The works may result in increased dust, noise and vibrations.  We will try to keep any disruption to a minimum, and we apologise in advance for any inconvenience.
  • Water supply to your property will be maintained, with a separate notice being given for the shut-off when connecting to the new pipes.
  • We will endeavour to complete works as efficiently as possible and return the road to normal operating conditions.

Thank you for your understanding and cooperation during the works.

Takiuru ki ā mātou ratonga
Log in to our services