Tay Street - drain renewal

What

We will be renewing the Council timber lined drain running through this property.

Why

The existing timber drain is past the end of its usable life. The renewal will provide bank stabilisation and maintain reliable land drainage through this area.

Where

19 Norah Street, Mairehau.

When

5 May 2025 to late August 2025. Monday to Friday, 8 am to 6 pm (weather/site condition dependent).

Contact

The contractor is City Care. Phone Conan Flewellen on 027 294 3872, Monday to Friday 7.30am to 5.30pm.

Details

  • All the works are to be undertaken off street but will include the grass berm area outside 19 Norah Street within the works area for staging plant and materials.
  •  Traffic management will be in place on the approaches to the works.
  •  The footpath outside the property may be closed at times during the works. When this occurs signage and crew members will assist pedestrians with direction to alternative routes.
  •  Localised noise will increase at times but will be minimised where possible.

 