What |
A new water supply and irrigation system is being installed at Rawhiti Domain, along with resurfacing the cricket block and establishing new grass on the Domain. |
---|---|
Why |
The existing irrigation system is unable to maintain a satisfactory grass cover during dry summers due to poor water pressure and overall age and condition of the system, which can result in an unsafe playing surface. The new system will allow an improvement in playing quality for both summer and winter sports. |
Where |
Rawhiti Domain, New Brighton |
When |
Late October 2023 to mid/late January 2024, Monday to Friday 7am to 6pm and Saturday 8am to 6pm (weather/site condition dependant). |
Contact |
The contractor is Terrafirma Turf Ltd. Contact Chris Lewis on 021 994 430, Monday to Friday, 8am to 5pm. |
The works include the installation of a new irrigation system and water supply, resurfacing of the central cricket block and establishment of a new turf grass surface. The full scope of works is as follows:
Noise
There may be increased noise, dust and vibrations during work but it shouldn’t impact on your power, water, gas or phone services.
Safety
Safety is our biggest priority so please keep children and pets away from worksites.
Bins
Please put your bins out as usual before 6am on your collection day. Our crew will move and return them if needed.
Other projects
Learn more about our work.
ccc.govt.nz/works
Request, report and pay for Council services.
Apply for building and resource consents.
Manage your library borrowing.
Receive your rates invoice by email.
Take full control of your Rec and Sport membership.
List your events on What’s On Christchurch
Request, report and pay for Council services.
Apply for building and resource consents.
Manage your library borrowing.
Receive your rates invoice by email.
Take full control of your Rec and Sport membership.
List your events on What’s On Christchurch