QEII park - storm water basin installation

What

QEII Master Plan storm water treatment basin.

Why

The basin is for the treatment of storm water from the School of Gymnastics building, the current and future car parks and the future changing rooms and sports field drainage system.

Where

QE II park, North West Corner of the adjacent single car park.

When

18 May 2022 to late September 2022. Monday to Friday, 7am to 5pm (weather/site condition dependent).

Contact

The contractor is Grounds and Services Ltd. Phone Darcy Arnold on 012 326 089, Monday to Friday, 7am to 5pm or email d.arnold@gsl.nz.

Details

The current works are in two stages:

1. Earthworks, basin formation

This will be the formation and grassing of the basin to allow settlement and cover of the basin floor before any water enters the basin. This will minimise the risk of any sediment entering the outlet into the rest of the storm water system.

2. Connection of the systems

The installation of the pipes and sumps to connect the car parks and buildings to the basin and commission the basin. 

 

Please find a copy of the master plan on the next page.