42C Antigua Street - stormwater renewal

What

We are renewing the stormwater pipes.

Why

The existing pipes have reached the end of their economic life.

Where

No.42C Antigua Street, Addington.

When

16 May 2022 to Mid-June 2022. Monday to Friday, 7am to 6pm (weather/site condition dependent).

Contact

The contractor is March Construction. Phone 027 250 0307, Monday to Friday, 7am to 6pm. Please advise us if you have specific property access requirements e.g. medical visits, home help, large vehicle, deliveries, and planned works.

Details

  • This work is located inside the boundary of No.42C Antigua Street.
  • Driveway access may be restricted during some activities but affected residences will be door-knocked the day before.

Takiuru ki ā mātou ratonga
Log in to our services