Seafield Road - repairs to Duvauchelle seawall

What

Replacement of a damaged section of seawall

Why

To replace the failing section of seawall and reinstate retention of the roadway

Where

Opposite No 1 Seafield Road

When

9 August 2021 to late-August 2021. Monday to Friday, 7am to 5.30pm (weather and tide dependent).

Contact

The contractor is City Care Ltd. phone 03 941 7200, Monday to Friday, 8am to 5 pm.

Details

  • The removal of 14m of failed seawall.
  •  Installation of precast wall panels and a cast institue footing behind the wall panels.
  •  Reinstatement of the roadway.
  • The section of Seafield Road between the Christchurch-Akaroa highway and No 1 Seafield Road will be closed during construction, a detour will be in place.

Takiuru ki ā mātou ratonga
Log in to our services