Main South Road / Yaldhurst Road / Riccarton Road intersection - safety improvements (Full road closure) NIGHT WORKS

What

We need to put a full night-time road closure in place at this intersection so we can carry out the final pavement surfacing.

Why

We’ve been installing traffic lights at this intersection in response to a high number of crashes in the area. This upgrade will provide a safer and easier way for everyone to navigate this busy area.

Where

Main South Road, Yaldhurst Road, and Riccarton Road intersection - commonly referred to as Church Corner, Upper Riccarton.

When

A full road closure will be in place from 9pm to 6am on Friday16 May and Sunday18 May 2025.
(Monday 19 May is scheduled as a contingency day if needed).

Contact

The contractor is HEB Construction Ltd. Phone Harrison Hunt on 022 427 6316, Monday to Friday, 7am to 6pm or email harrison.hunt@heb.co.nz.
For assistance outside these hours, please contact Zane Tomalin on 027 320 3285.

Details

Key information:

Full road closure - A full night-time road closure is required during the final pavement surfacing, to allow complete access to the road. Closure points will be set up at Hansons Lane, Brake Street, Angela Street, Yaldhurst Road, and Main South Road. Detours are shown on the following page.

Property access - You’ll still be able to access your property while work is underway. If you have access needs - such as medical appointments, essential deliveries, home support services, or scheduled work at your property - please let us know in advance so we can accommodate you. The businesses in the area will remain open as usual.

Noise and vibrations - Some noise and vibration is to be expected. We’ll minimise these impacts by scheduling the noisiest activities earlier in the evening.

Daytime traffic impacts (6:00am–7:30pm) - There will be minimal impact on daytime traffic. A reduced speed limit will be in place, and some traffic management equipment may be visible as we prepare for evening work.

Parking - On-street parking may be unavailable at times during construction.

Additional traffic management - Other traffic management setups may be introduced as we progress.

Pedestrian access - Impacts on pedestrian access will be minimal. Changes or detours will be signposted.

Bus stop changes - Some bus stops will be be temporarily relocated during work hours. Notices will be displayed at each affected stop with updated information.

 