Retaining Wall RW3434 Repairs

What

Filling the voids at the top of the crib wall under the footpath.

Why

To ensure the stability of the footpath.

Where

38 Clifton Terrace.

When

Programmed to start 14 June, finishing by the end of June 2019.

Contact

The contractor is Hunter Civil. Phone 03 381 7094 between 8.00am and 5.30pm. Advise us if you have specific property access requirements e.g medical visits, home help, large vehicle deliveries, planned works.

The works will include:

  • filling of voids under the footpath with concrete
  • a concrete facing to the wall openings to prevent future loss of fill material
  • replacement of 3 sections of handrail mesh

The roadway will remain open to single lane traffic during the works.

 