|
Do I need a building consent to repile my house?
In accordance with the Building Act 2004, a Building consent is not required for re-piling unless there are changes to the structure or structural integrity, i.e. under pinning, foundation design change, or change of pile layout. In such circumstances a building consent is required.
Owners are recommended to obtain a building consent in all cases for the purpose of recording the work.
Contact Details
pile, piling, repiling, re-piling, re-pile, building consent, permit, re-stumping,
Other Information
|