Do I need a building consent to repile my house?

In accordance with the Building Act 2004, a Building consent is not required for re-piling unless there are changes to the structure or structural integrity, i.e. under pinning, foundation design change, or change of pile layout. In such circumstances a building consent is required.

Owners are recommended to obtain a building consent in all cases for the purpose of recording the work.