Please Wait...
progress bar
Last reviewed: Thu, 15 Sep 2011

Facts and figures

General

% of Christchurch population reticulated
(The remainder in rural areas have septic tanks and other on-site systems or a weekly nightsoil collection)
99.9%
Number of households currently serviced by CWTP (as at February 2009) 146,442 (approx)
Length of time wastewater takes from kitchen sink to CWTP
(Amount of time varies from an hour to almost a day depending on distance from CWTP)
Max 24 hours
Average life of pipes at least 90 years
Sewer system replacement cost $1,225 million
% wastewater volume domestic 86%
% wastewater volume commercial/industrial 14%

Reticulation

Length of public pipe reticulation system 1,626km
Longest single stretch of pipe (from furthest point to CWTP) 20km
Smallest diameter pipe used 150mm
Largest diameter pipe used 1.8m
Length of large diameter trunk sewers 13km
Length of pressure pipes 150km
Number of manholes 25,900
Number of flush tanks 1,630

Pumping

Number of pumping stations 120 
Number of pumps 239 
Number of backup generators 13 
Number of odour control sites 33 
Number of lines leading from terminal pumping stations to CWTP 5
Total capacity of terminal pumping stations to CWTP 6,610 l/s (litres per second)
Treatment plant
Main treatment plant at Bromley providing:
  • screening
  • pre-aeration and grit removal
  • primary sedimentation
Liquids to:
  • trickling filter
  • secondary sedimentation
  • oxidation ponds
  • Ocean Outfall
Solids to:
  • digesters
  • holding tanks
  • belt press
  • reuse in farm/forest
 

Authorising Unit: Asset and Network Planning

Last reviewed: Thursday, September 15, 2011

Next review: Thursday, March 15, 2012

Keywords: pump station, pump station pumping sewer water leak flood floodi, pump stations, pumping station, reticulation, wastewater, wastewater treatment plant