Wastewater homepage
  Wastewater

Facts and Figures


General

% of Christchurch Population Reticulated
(The remainder in rural areas have septic tanks and other onsite systems or a weekly nightsoil collection)
99.9%
Number of households currently serviced by CWTP: (as at July, 2002)  
Christchurch 117,676 (approx)
Belfast 1,315
Length of time wastewater takes from kitchen sink to CWTP:
(Amount of time varies from an hour to almost a day depending on distance from CWTP)
Max 24 hours
Average life of pipes: at least 90 years
Sewer System replacement cost: $582 million
% Wastewater volume domestic 90%
% Wastewater volume Commercial/Industrial 10%

Reticulation

Length of public pipe reticulation system: 1,562 km
Longest single stretch of pipe: 20 km (From furthest point to Treatment Plant)
Smallest diameter pipe used: 150mm
Largest diameter pipe used: 1.5 m square
Number of manholes: 22,105
Length of main sewers: 192 km
Length of private laterals (under council care) 1,100 km
Number of flushtanks: 1,600

Pumping

Number of pumping stations: 84
Number of pumps: 165
Number of backup generators: 8
Total pumping capacity: 8,700 l/s (litre per second)
Number of soil filters: 16
Number of lines leading to Treatment Plant: 5
Total capacity of delivery to CWTP: 4,480 l/s (litre per second)
Treatment Plants
One minor Treatment Plant at Belfast
Major Treatment Plant at Bromley providing:
  • screening
  • pre-aeration and grit removal
  • primary sedimentation, then
Liquids to:
  • trickling filter
  • secondary sedimentation
  • oxidation ponds
  • Estuary
Solids to:
  • digesters
  • holding tanks
  • belt press
  • reuse in farm/forest

Christchurch City Council, PO Box 237, Christchurch Mail Centre, Christchurch 8140, New Zealand
Contact the Council : Terms of use