Scope of work
This grant application focused on the seismic upgrading of the building.
The work undertaken involved the temporary stabilisation of the upper floors during the strengthening works; providing structural steel bracing and connections of the façade at the first floor, second floor and roof levels; and strengthening of the lift shaft.
Outcome
The seismic upgrading was completed in 2005.
Efforts to strengthen un-reinforced masonry buildings is of high importance and will reflect on their performance during a moderate earthquake in the South Island.
The Heritage Incentive Fund is part of the strategy to assist owners in protecting the city’s heritage for future generations.